Purpose

Railway crossings degrade significantly faster than plain line track, with lifespans commonly lasting less than 5 years despite their design lives typically being 15 years. This results in Billions of Euros being spent on unplanned corrective maintenance, crossing renewals and delay-minutes, which would not occur if they could be better managed to reach their design lives.
Thus, XCROSS will develop a suite of integrated disruptive technologies which combine to provide a technological process for the monitoring, inspection and intervention of crossing surface profiles. This will result in a step-change in both the cost and quality of railway crossing maintenance.

Project at a glance

Co-funded by the European Union through the Europe's Rail Joint Undertaking research and innovation programme, XCROSS - The next generation of railway crossing asset management technology  aims at a step-change in both the cost and quality of railway crossing through the use of technologies such as Augmented Reality, Digital Twin, 3D laser scanning and 3D printing.

Project at a glance

Objectives

[Paragraph Images]_[Objectives 1, 2 & 3]

Objective #1:
To significantly reduce lifecycle costs by minimising the number and scope of maintenance interventions performed on crossings. This will be achieved by using data methods to improve the quality control of interventions.

Objective #2:
To significantly reduce in-service disruptions (e.g. delay minutes) due to fewer actionable track crossing surface defects and associated failures. This will be achieved by developing new lightweight 3D scanning procedures and computer vision algorithms for crossing inspection.

Objective #3:
To extend the lifespan of crossings by providing maintainers with data-driven tools to guide maintenance and ensure quality. This will be achieved through an augmented reality app that projects a heatmap overlay on-site and a 3D printed visualization tool.

I nostri progetti

Dove l'innovazione diventa essenziale

  • 01 NOME CLIENTE OPZIONALE

    Lorem ipsum

    Lorem ipsum dolor sit amet consectetur. Purus facilisi diam semper quam.

  • 02 NOME CLIENTE OPZIONALE

    Lorem ipsum

    Lorem ipsum dolor sit amet consectetur. Purus facilisi diam semper quam.

  • 03 NOME CLIENTE OPZIONALE

    Lorem ipsum

    Lorem ipsum dolor sit amet consectetur. Purus facilisi diam semper quam.

[Paragraph Images]_[Objectives 4 & 5]

Objective #4
To provide infrastructure managers for the first time with a data-driven, low-cost path to the implementation of preventative maintenance at crossings. This will be achievable using a high-precision AR heatmap overlay which will provide grinders will unique information needed to accurately perform shallow preventative grinding on a crossing.

Objective #5:
Significantly reducing crossing asset inspection time compared to traditional visual methods. This will be achieved by developing new lightweight 3D scanning procedures for crossing inspection.

TXT Role

Within the consortium, TXT leads the activities related to the AR profile visualisation tools. This includes:
- Drafting of technical specifications and design of the advanced HMI/AR application to assist asset management quality assurance;
- Integration of the advanced HMI/AR; application with 3D scanning and digital twin
- Production of the prototype for inspection and repair.

Partners

01

Logo_ETech

TXT E-Tech

02

AIMEN

AIMEN

03

EVOPRO INNOVATION KFT_Logo

EVOPRO

04

undefined-624542607

TUDELFT

05

UNIVERSITY OF LEEDS_Logo

UNIVERSITY OF LEEDS

06

EURNEX e. V._Logo

EURNEX

07

PRORAIL BV_Logo

PRORAIL

08

TECHNISCHE UNIVERSITEIT DELFT_Logo

TECHNISCHE UNIVERSITAT DRESDEN

09

ROTTERDAMSE ELEKTRISCHE TRAM NROTTERDAMSE ELEKTRISCHE TRAM NV_Logo

RET

10

UNION INTERNATIONALE DES CHEMINS DE FER_Logo

UIC

11

Logo_Rail

Europe's Rail

Project Key Information

PROJECT NUMBER: 101178744

PROJECT DURATION: 30 MONTHS

START DATE: 1 OCTOBER 2024

END DATE: 31 MARCH 2027

FUNDING ENTITY: EUROPE'S RAIL JOINT UNDERTAKING (HORIZON JU RESEARCH AND INNOVATION ACTIONS)

PROJECT BUDGET: € 2.037.787,70

PROJECT OFFICIAL WEBSITE: HTTPS://XCROSS-RAIL.EU/

logo_european-union

Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union . Neither the European Union nor the granting authority can be held responsible for them.

Get in touch

Contact us for any further information.

Contact us for any further information.